I Worked closely with a team of local construction workers, electricians ,plumbers, carpenters and other professionals such as surveyors and civil engineers. I was in charge of producing drawings and specifications for construction.
Identifying customer requirements and attending meetings on site.
Coordinating technicians and crafts people
Assessing the impact that building have on the local environment.
Ensuring that the building projects were completed within budget and schedule.
Liaising with local authorities and regulatory bodies : building regulations, writing design and technical reports.
An understanding of all aspects of the design and procurement process.
Responsible for specifying the nature and quality of materials required and how they despond in the ensemble of the building.

Architectonic Plans

This project is set in a poor area where the surrounding buildings are of exposed materials.
So we mimicked the building to fit in to the environment.
Even a brick wants to be something.
Louis Kahn
3D Ground Floor Plan

Sections







External and internal Views
The Construction
As you can see above, All the design process was made carefully to complain with regulations, the clients needs and also to build something that could mimic the space around.
The use of red brick was essential in this project no just because his thermal qualities, cost and materiality it's also the rough appearance. Therefore we leave it exposed.
_JPG.jpg)
_JPG.jpg)
I recruit the team knocking on the neighbours doors and asking them if they would like to join the team, This area was full of construction workers and also its an area that his in gentrification because is close to the beach and also to town.


_JPG.jpg)
Below some of the views

_JPG.jpg)


